Line 90: Line 90:
|| || FoV scan spectro || || 2h || || ||  || || FoV scan spectro || || 2h || || ||
Line 95: Line 95:
|| || Photo bandpass + low freq || || 10h || || ||   
|| || Photo + low freq electronics drift || || 4h || || ||   
|| || recycling - different script -let ev reach 2K) || || 2h || || ||   
|| || Photo bandpass + low freq || || 10h || || ||
|| || Photo + low freq electronics drift || || 4h || || ||
|| || recycling - different script -let ev reach 2K) || || 2h || || ||
Line 107: Line 107:

FM ILT 2 - planned and executed tests

Date

Test

Procedure

dur

Analysis

Status

20070307

Filter wheels without redundant connected

FmIltProc/FwControlloop (6)

1.5h

FmIltAnal/FwDisconnect

(11h35) Cooler recycling

2h

PHOTO bandpass direct mode

PHOTO FoV scan hot CS + OGSE BB

0.5h

PHOTO Low frequency 2pW_lowBias

12h

20070308

PHOTO Low Frequency, bandpass, ...

20070309

(12h00) PHOTO Cooler recycling

PHOT FOV maps

PHOT Focus + offset to spec(XY-stage)

20070310

PHOT FOV maps

PHOT Distortions (point source map XY-stage)

20070311

He tank filling + pumping

20070312

SPEC thermal behaviour

SPEC FoV maps

SPEC RSRF, linearity, flux repro

20070313

Setup laser + pretests

SPEC RSRF, linearity, flux repro

20070314

SPEC instrumental profile (laser)

SPEC RSRF, linearity, flux repro

20070315

SPEC instrumental profile (laser)

SPEC RSRF, linearity, flux repro

20070316

SPEC AOT tests (laser)

SPEC RSRF, linearity, flux repro

20070317

SPEC wavelength cal (H2O vapour cell)

SPEC RSRF, linearity, flux repro

20070318

He tank filling + pumping

20070319

SPEC wavelength cal (H2O vapour cell)

SPEC RSRF, linearity, flux repro

20070320

SPEC wavelength cal (H2O vapour cell)

SPEC RSRF, linearity, flux repro

20070321

SPEC wavelength cal (H2O vapour cell)

SPEC RSRF, linearity, flux repro

20070322

Background measurements laser spectra

Filter wheel tests

Electrical checkouts oscillations

SPEC RSRF, linearity, flux repro

20070323

Electrical checkouts oscillations

Emissivity CS

SPEC RSRF, linearity, flux repro

20070324

Emissivity CS

SPEC RSRF, linearity, flux repro

20070325

He tank filling + pumping

20070326

IMT/IST full functional test

IMT/IST AOT tests

20070327

IMT/IST short performance spectro

IMT/IST short performance photo

20070328

IMT/IST L0 tests

PHOT Low frequency / bandpass

20070329

AOT tests PHOTO

20070330

PHOT PSF, absolute flux, FoV maps

20070331

PHOT PSF, absolute flux, FoV maps

20070401

He tank filling + pumping

20070402

Redundant component tests

20070403

AOT tests SPEC

20070404

Degraded modes, procedural tests

20070405

Warm-up and venting

20070411

SFT warm

20070412

Delivery

SPEC Flasher performance

1h00m

Red GeGa NCR : bias_R to 0

0h10m

Red GeGa NCR : capacitance loop / BB21.8K

0h50m

Red GeGa NCR : capacitance loop / BB22.2K

0h50m

Red GeGa NCR : capacitance loop / BB23.7K

0h50m

Red GeGa NCR : capacitance loop / BB25.2K

0h50m

Red GeGa NCR : capacitance loop / BB28.0K

0h50m

Red GeGa NCR : capacitance loop / BB29.8K

0h50m

Red GeGa NCR : crosstalk edge CS1/2

Dynamic range - 4K/4K

1h

Dynamic range - 58K/60K

1h

Emissivity CS 1 36K

1h

Emissivity CS 2 36K

1h

Emissivity CS 1 48K

1h

Emissivity CS 2 48K

1h

Emissivity CS 1 80K

1h

Emissivity CS 2 80K

1h

Emissivity CS 1 100K

1h

Emissivity CS 2 100K

1h

Spectral flatness CS 1

2h

Spectral flatness CS 2

2h

RSRF medium angle +

11h

RSRF medium angle -

11h

RSRF small angle -

11h

RSRF large angle -

11h

Linearity chopped 6temp

6x20m

FoV scan spectro

2h

Chopper SFT

1h

Chopper SFT Redundant

1h

Chopper control parameter optimisation ?

4h

Transients spectro

4h

Photo bandpass + low freq

10h

Photo + low freq electronics drift

4h

recycling - different script -let ev reach 2K)

2h

Tuning parameters SPU

4h

FoV map hot CS / cold BB

1h

Photometric system calibration

FW ?

10h

Diagnostic tests PSF

4h

PSF Photometer

24h?

Spectro PSF/alignment

20h

RSRF unresolved fringing

1h

AOT test spectro xy stage

IMT/IST tests

5x8h

Spec wavelength vapour cell

27h

Spec AOT vapour cell

4h