Size: 823
Comment:
|
← Revision 20 as of 2009-07-15 14:32:36 ⇥
Size: 1272
Comment: converted to 1.6 markup
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
The '''testcontrol-server''' application has to be started from an account that has access to the '''cus''' engine (usually account cususer@PACS1 here at MPE). The communication between TOPE and CUS is done by the system wide '''X-server''' application. Hence, '''testcontrol-server''' has to be associated, via the DISPLAY variable, with the '''''irmultia''''' processor. The association is implemented as {{{ (setenv DISPLAY irmultia:0 ; testcontrol-server &) }}} That is, redefine DISPLAY only for the '''testcontrol-server''' application and start the control application as a background task. |
The '''testcontrol-server''' application is started automatically by the procedure that updates '''cus''' following adding or editing a script module into the CUS registry. |
Line 9: | Line 5: |
[wiki:Self:PACS/FM Setup to schedule CUS from TOPE] | |
Line 11: | Line 6: |
[wiki:Self:PACS/FM Correcting CUS procedures] | The setup of the PACS MPE FM Databases are described : [[PACS/FM_ILT_Procedures/DatabaseProcedures|DatabaseProcedures]] Current Datbase configuration for CUS use : {{attachment:dbsetup7.jpg}} * In the current configuration PACS5 is the operational database * "pacs_fm_ilt_2" is used as operational database * "pacs_fm_ilt_2" is used for commanding and telemetry ingestion * In the current configuration PACS1 is used for development of the CUS definitions and procedures. * "sftcode" is the CUS development database * "sftcode" is accessed from within MPE and remote via cusgui [[PACS/FM_ILT/SetupCUS|Setup to schedule CUS from TOPE]] [[PACS/FM_ILT/CorrectCUS|Correcting CUS procedures]] [[PACS/FM_ILT/SupportCUS|Support Procedures]] [[PACS/FM_ILT/CUSDev|CUS Procedures Development]] [[PACS/FM_ILT/CUSExp|CUS Procedure export and configuration control]] [[PACS/FM_ILT/CUSLoad|CUS Procedures loading into operational Database]] |
To schedule a CUS "mode" script from TOPE requires the intervention of the testcontrol-server application.
The testcontrol-server application is started automatically by the procedure that updates cus following adding or editing a script module into the CUS registry.
The setup of the PACS MPE FM Databases are described : DatabaseProcedures
Current Datbase configuration for CUS use :
* In the current configuration PACS5 is the operational database
- "pacs_fm_ilt_2" is used as operational database
- "pacs_fm_ilt_2" is used for commanding and telemetry ingestion
- In the current configuration PACS1 is used for development of the CUS definitions and procedures.
- "sftcode" is the CUS development database
- "sftcode" is accessed from within MPE and remote via cusgui
Setup to schedule CUS from TOPE