Differences between revisions 13 and 17 (spanning 4 versions)
Revision 13 as of 2014-04-04 10:12:53
Size: 1359
Editor: VadimBurwitz
Comment:
Revision 17 as of 2014-04-04 10:25:09
Size: 1545
Editor: VadimBurwitz
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
Line 11: Line 10:
 This should usally be the case.   * This should usally be the case.
Line 13: Line 12:
 * If they are not started, start up windows internet explorer.
   {{attachment:PC2_expl_weather_ePower01Marked.JPG}}
  * If not start the programs and try to connect.
 

 * If they
are not started, and cannot connect, then start up windows internet explorer.
   {{attachment:PC2_expl_weather_ePower01Marked.JPG|width=100 height=100}}
Line 19: Line 21:
 * Power up the '''focuser''' if necessary and check the the '''focuser''' control is running and connected.  * Power up the '''focuser''' if necessary and check the the '''focuser''' control program is running and connected.
Line 22: Line 24:
Line 24: Line 27:
  * then toggle mount switch both on '''ePower #1''')
* then toggle mount switch both on '''ePower #1'''
Line 26: Line 30:
  
  * checked if '''Mount handpad''' control program connects properly.

How to start up observatory

  • Check weather (outside conditions)

  • Log on to control PC via VNC skydome.mpe.mpg.de port 5200

  • 1st check if mount handpad program and focuser program are running and connected to mount and focuser respectively.

    • This should usally be the case.
    • If not start the programs and try to connect.
  • If they are not started, and cannot connect, then start up windows internet explorer.
    • width=100 height=100

  • Then Log on to ePower #1 and check if focuser and mount are powered on ePower #1.

    • ePower01AllOnCCDoffMarked.JPG

  • Power up the focuser if necessary and check the the focuser control program is running and connected.

  • Power up mount if necessery:

    • switch on power supply on ePower #1

    ePower01MountPowerOff.JPG

    • then toggle mount switch both on ePower #1

    ePower01MountSwitchBatchmodeOnOff.JPG

    • checked if Mount handpad control program connects properly.

  • Power up imager/s on ePower #1 ePower01CameraOff.JPG

  • open dome

How to start up GOWI

  • cool imager to target temperature (-30C typically)
  • start dark and bias frame sequence
  • set focuser to expected setting for the night (if known)
  • take skyflats until start of actual observations

cogwiki: HowTo/Startup (last edited 2022-10-08 17:04:36 by VadimBurwitz)