Size: 461
Comment:
|
Size: 1188
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
* Power up mount and imager(s) if not already powered up (ethernet PDU) | * Log on to control PC via VNC '''skydome.mpe.mpg.de''' port '''5200''' * 1st check if '''mount handpad''' program and '''focuser''' program are running and connected to mount and focuser respectively. This should usally be the case. * If they are not started, start up windows internet explorer. {{attachment:PC2_expl_weather_ePower01Marked.JPG}} * Log on to '''ePower #1''' * Check if focuser and mount are powered on '''ePower #1'''. {{attachment:ePower01AllOnCCDoffMarked.JPG}} * Power up the focuser is necessary * Power up mount if necessery: (switch on power supply, then toggle mount switch both on ePowerSwitch #1) if not yet powered up (usually it should be powered up). * power imager(s) if not already powered up (ethernet PDU) |
How to start up observatory
Check weather (outside conditions)
Log on to control PC via VNC skydome.mpe.mpg.de port 5200
1st check if mount handpad program and focuser program are running
- and connected to mount and focuser respectively. This should usally be the case.
- If they are not started, start up windows internet explorer.
Log on to ePower #1
Check if focuser and mount are powered on ePower #1.
- Power up the focuser is necessary
- Power up mount if necessery: (switch on power supply, then toggle mount switch both on ePowerSwitch #1)
- if not yet powered up (usually it should be powered up).
- power imager(s) if not already powered up (ethernet PDU)
- open dome
How to start up GOWI
- cool imager to target temperature (-30C typically)
- start dark and bias frame sequence
- set focuser to expected setting for the night (if known)
take skyflats until start of actual observations