Differences between revisions 1 and 2
Revision 1 as of 2008-02-13 12:42:03
Size: 853
Editor: dcesarsky
Comment:
Revision 2 as of 2008-02-13 12:42:55
Size: 873
Editor: dcesarsky
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
This building block is identical to SPEC_Chopper_dhk_4hk_1khz_bb except that we add one more word to the HK (parameter 249). This building block is identical to SPEC_Chopper_dhk_4hk_1khz_bb except that here we add one more word to the HK parameter list (parameter 209).

SPEC_Chopper_dhk_5hk_1khz_bb

This building block is identical to SPEC_Chopper_dhk_4hk_1khz_bb except that here we add one more word to the HK parameter list (parameter 209).

// Purpose      :  Setup diagnostic housekeeping for the FM
//                 chopper tests. Special HKs.
//
// Author       : Markus Nielbock
// Description  : Set up 5 housekeeping parameter for diagnostic housekeeping
//        of the chopper for open loop tests.
// Preconditions   : PACS switched-on, setup spectroscopy and SPEC_Chop_fft_eqmimt_obs
// Comments     : This script is based on the commanding during the CQM ILT.
// Version      : 1.0
// History      :
//        1.0 29-03-07 MN. Spec. HK for open loop measurements.
//        1.1 21-jan-2008 DAC Added WiteEndBB
//

Input variable(s):

block SPEC_Chopper_dhk_5hk_1khz_bb PACS 474 {
}{

Herschel: PACS/CUSPVscripts/SPEC_Chopper_dhk_5hk_1khz_bb (last edited 2009-07-15 14:32:36 by localhost)